Page-cited permit extraction

Anthem CDC 3

Harrisonburg City, Virginia

QA status Machine-extractedRelease dated July 29, 2026

EVIDENCE NOTE

What the public record says

A machine-extracted candidate of equipment groups and permit limits stated in Virginia DEQ permit 81609-5, with one-based PDF page citations. Permitted terms do not establish actual operation or emissions.

Primary sourceVirginia DEQ permit document

Virginia Department of Environmental Quality

Open original source ↗

Summary fields cite p. 1, p. 3.

What this record does not establish

The source confirms the document and its stated fields. This profile does not infer actual emissions, compliance history, operating status, facility capacity or environmental impact where those facts are not established by the cited document.

How to read the status

Issued means the agency granted the permit subject to its conditions. It does not mean every permitted unit is operating, that maximum permitted emissions occur, or that later amendments do not exist.

MACHINE-EXTRACTED CANDIDATE

Equipment and limits,
kept separate from actual use.

These page-cited rows are machine-extracted and still require a second manual review. Verify every reused value against the linked official PDF. Page numbers refer to the one-based position in the linked PDF. Blank values are not zero.

Permitted equipment

1 document-defined equipment groups. Counts and per-unit ratings are transcribed; combined capacity is not calculated.

ReferenceEquipment / modelCount / ratingFuel / controlsStated operating fieldSource
emergency engine generator set4 unitsNo reliable per-unit rating transcribedSee operating-scope tablep. 1Machine-extracted from explicit permit prose: Chambers: Attached is an administrative amendment to your new source review permit dated September 4, 2008 as amended June 18, 2010 and September 1, 2010 to construct and operate emergency generators for a data center facility in accordance with the provisions of the Virginia Regulations for the Co

Operating scope

Authorized hours, time windows or an explicit finding that no numeric annual-hour cap was located in the reviewed sections.

ReferenceLimitBasisSource

Permitted emission limits

11 pollutant, unit-group and limit rows. These are permit terms, not measured or actual emissions.

Inspect 11 transcribed limit rows
ReferencePollutantLimitBasis / scopeSource
each of the 12 electric power generators (units 1 through 12)NOx as NO248.11 lb/hrhourlyp. 7Machine-extracted from a page line in an older official PDF; literal context: 11. Hourly Emission Limits - Emissions from the operation of each of the 12 electric power generators (units 1 through 12) shall not exceed the limits specified below: Nitrogen Oxides 48.11 lb/hr (asNOz)
each of the 12 electric power generators (units 1 through 12)SO21.46 lb/hrhourlyp. 7Machine-extracted from a page line in an older official PDF; literal context: Nitrogen Oxides 48.11 lb/hr (asNOz) Sulfur Dioxide 1.46 lb/hr Carbon Monoxide 5.86 lb/hr
each of the 12 electric power generators (units 1 through 12)NOx as NO25.86 lb/hrhourlyp. 7Machine-extracted from a page line in an older official PDF; literal context: (asNOz) Sulfur Dioxide 1.46 lb/hr Carbon Monoxide 5.86 lb/hr Volatile Organic Compounds 1.07 lb/hr
each of the 12 electric power generators (units 1 through 12)VOC1.07 lb/hrhourlyp. 7Machine-extracted from a page line in an older official PDF; literal context: Sulfur Dioxide 1.46 lb/hr Carbon Monoxide 5.86 lb/hr Volatile Organic Compounds 1.07 lb/hr (9 VAC 5-80-1180 and 9 VAC 5-50-260)
12 electric power generators (units 1 through 12)PM0.54 tpyannualp. 7Machine-extracted from a page line in an older official PDF; literal context: 12. Annual Emission Limits - Total annual emissions from the operation of the 12 electric power generators (units 1 through 12) shall not exceed the limits specified below: Particulate Matter (PM) 0.54 tons/yr PM-10 0.54 tons/yr
12 electric power generators (units 1 through 12)NOx as NO264.47 tpyannualp. 7Machine-extracted from a page line in an older official PDF; literal context: Particulate Matter (PM) 0.54 tons/yr PM-10 0.54 tons/yr Nitrogen Oxides 64.47 tons/yr (as N0 )
12 electric power generators (units 1 through 12)SO21.95 tpyannualp. 7Machine-extracted from a page line in an older official PDF; literal context: (as N0 ) 2 Sulfur Dioxide 1.95 tons/yr Carbon Monoxide 7.85 tons/yr
12 electric power generators (units 1 through 12)NOx as NO27.85 tpyannualp. 7Machine-extracted from a page line in an older official PDF; literal context: 2 Sulfur Dioxide 1.95 tons/yr Carbon Monoxide 7.85 tons/yr Volatile Organic Compounds 1.43 tons/yr
12 electric power generators (units 1 through 12)VOC1.43 tpyannualp. 7Machine-extracted from a page line in an older official PDF; literal context: Sulfur Dioxide 1.95 tons/yr Carbon Monoxide 7.85 tons/yr Volatile Organic Compounds 1.43 tons/yr These emissions are derived from the estimated overall emission contribution from
visible emissions10 percent opacityvisiblep. 8Machine-extracted from a page line in an older official PDF; literal context: (9 VAC 5-80-1180 and 9 VAC 5-50-260) 14. Visible Emission Limit - Visible emissions from the 12 electric power generators (units 1 through 12) shall not exceed 10 percent opacity except during one six-minute period in any one hour in which visible emissions shall not exceed 20 percent opacity as determined by
visible emissions20 percent opacityvisiblep. 8Machine-extracted from a page line in an older official PDF; literal context: 14. Visible Emission Limit - Visible emissions from the 12 electric power generators (units 1 through 12) shall not exceed 10 percent opacity except during one six-minute period in any one hour in which visible emissions shall not exceed 20 percent opacity as determined by EPA Method 9 (reference 40 CFR 60, Appendix A). This condition applies at all times

DOCUMENT HISTORY

What this document says it changes

amended or superseding permit document

No superseded-document date is asserted beyond the cited source wording.

p. 1, p. 3

QA NOTES

Ambiguity stays visible

  • Machine-extracted candidate. Verify every reused value against the cited official PDF page.
  • Prose fallback; verify equipment grouping.
  • Older-PDF text fallback; verify row and unit alignment.
← Return to evidence index