Search verified public sources behind data-center utility cases, moratoria, legislation and environmental permits. This is a growing records map—not a national facility count.
Google Trends surfaced a 20K+ search spike around Northern Virginia data-center disconnection and a separate ratepayer-protection trend. The briefs below follow those searches back to primary records.
Search by state, locality or issue. Every result links to a government record or, in Virginia, an index whose rows link directly to agency documents.
No result is treated as proof that a facility was built, began operating, caused pollution or received every required approval.
8 of 8 verified records
SCStatewide
Utility docketOpen docket
Docket 2026-138-E: comments on large-load additions
The Public Service Commission docket is open to receive comments addressing large-load additions. The docket card is the place to verify current filings, orders, hearings and deadlines.
APS rate case: treatment of extra-high-load customers
The Arizona Corporation Commission says the case includes proposed changes to APS's Extra High Load Factor, which applies to large-load users including data centers. A recommended order is expected before a Commission vote.
Bill 24-26E: proposed two-year building-permit moratorium
The introduced bill would prohibit the county Department of Permitting Services from issuing a building permit for a data center and would sunset two years after taking effect.
The governor's office says DEC will pause discretionary permits not already deemed complete while the state develops a generic environmental review and regulatory framework.
The Georgia Public Service Commission record provides the public filing page and attachments for Georgia Power's quarterly large-load economic-development report.
The Wisconsin PSC described changes to a proposed tariff for very large customers and identifies 6630-TE-113 as the docket containing the proceeding's documents.
The enacted measure directs the Public Utility Commission to create a service classification for large energy-use facilities and requires cost allocation and risk protections for other retail customers.
The Public Evidence index normalizes permit identifiers, facilities, dates, localities and regional offices and links each row to the Virginia DEQ document.
State and issue tags let future briefings stay relevant. We collect contact preferences now; outbound briefings remain disabled during this collection phase.