QA status Second-reviewedRelease dated July 29, 2026
EVIDENCE NOTE
What the public record says
A machine extraction that passed a second manual review of equipment groups and permit limits stated in Virginia DEQ permit 11541-3, with one-based PDF page citations. Permitted terms do not establish actual operation or emissions.
The source confirms the document and its stated fields. This profile does not infer actual emissions, compliance history, operating status, facility capacity or environmental impact where those facts are not established by the cited document.
How to read the status
Issued means the agency granted the permit subject to its conditions. It does not mean every permitted unit is operating, that maximum permitted emissions occur, or that later amendments do not exist.
SECOND-REVIEWED EXTRACTION
Equipment and limits, kept separate from actual use.
This is a conservative transcription of reviewed permit sections, not an exhaustive legal digest. Page numbers refer to the one-based position in the linked PDF. Blank values are not zero.
Permitted equipment
1 document-defined equipment groups. Counts and per-unit ratings are transcribed; combined capacity is not calculated.
Reference
Equipment / model
Count / rating
Fuel / controls
Stated operating field
Source
1;2;3
emergency engine generator setCaterpillar
3 units1500 kW each
distillate fuel oil0.5 weight percent
500 hourshours/year per unit; consecutive 12-month period
p. 4 ↗, p. 5 ↗Manual correction after visual review of the OCR-heavy official PDF.
Operating scope
Authorized hours, time windows or an explicit finding that no numeric annual-hour cap was located in the reviewed sections.
Reference
Limit
Basis
Source
500 hours/year
Oorp^ite Office Properties, LP Registration Number11641 May 16, 2006 Page3 3. Operating ^ours^The Caterpillar diesel-powered emergency generators shall not operate more than 500 hoursperyear each,calculated monthly as tbe sum of each consecutive 12-month penod. 5-60-1160) 4. PueiSpecifications-The distillate oil consumed bythe generators shall meetASTM 0396-76 specifications for numbers1or2fuel oil, withamaMachine-extracted normative operating-hours statement; second review pending.
Prose fallback; verify equipment grouping. Older OCR-heavy permit; equipment page 4 and operating/emission limits page 5 visually checked and corrected.
Confirm whether the limit is per unit, combined, or limited to testing/maintenance. Older OCR-heavy permit; equipment page 4 and operating/emission limits page 5 visually checked and corrected.
Older-PDF text fallback; verify row and unit alignment. Older OCR-heavy permit; equipment page 4 and operating/emission limits page 5 visually checked and corrected.
Replaced collapsed OCR candidates with three equipment units and page-5 hourly, annual, and visible-emission rows. — Older OCR-heavy permit; equipment page 4 and operating/emission limits page 5 visually checked and corrected.