Page-cited permit extraction

1501 Moran Road Development Owner, LLC

Loudoun Co., Virginia

QA status Machine-extractedRelease dated July 29, 2026

EVIDENCE NOTE

What the public record says

A machine-extracted candidate of equipment groups and permit limits stated in Virginia DEQ permit 74315-1, with one-based PDF page citations. Permitted terms do not establish actual operation or emissions.

Primary sourceVirginia DEQ permit document

Virginia Department of Environmental Quality

Open original source ↗

Summary fields cite p. 1, p. 3.

What this record does not establish

The source confirms the document and its stated fields. This profile does not infer actual emissions, compliance history, operating status, facility capacity or environmental impact where those facts are not established by the cited document.

How to read the status

Issued means the agency granted the permit subject to its conditions. It does not mean every permitted unit is operating, that maximum permitted emissions occur, or that later amendments do not exist.

MACHINE-EXTRACTED CANDIDATE

Equipment and limits,
kept separate from actual use.

These page-cited rows are machine-extracted and still require a second manual review. Verify every reused value against the linked official PDF. Page numbers refer to the one-based position in the linked PDF. Blank values are not zero.

Permitted equipment

1 document-defined equipment groups. Counts and per-unit ratings are transcribed; combined capacity is not calculated.

ReferenceEquipment / modelCount / ratingFuel / controlsStated operating fieldSource
GEN-1 through GEN-24emergency engine generator setCaterpillar · C175-1624 units3000 kW eachdiesel fuel oilSee operating-scope tablep. 4Machine-extracted from an official document equipment table; column grouping requires second review.

Operating scope

Authorized hours, time windows or an explicit finding that no numeric annual-hour cap was located in the reviewed sections.

ReferenceLimitBasisSource
GEN-1 through GEN-2429 hours/yearion of each unit (which involves fuel combustion) shall be minimized to the maximum extent practical. (9VAC5-80-1180) [4/15/2025] 7. Operating Hours – Each individual emergency diesel engine gen-set (Ref. Nos. GEN-1 through GEN-24) shall not operate more than 29 hours per year for scheduled maintenance checks and readiness testing (Scheduled MCRT, as provided in Condition 3.c). Each individual emergency diesel engine gen-set (Ref. Nos. GEN-1 through GEN-24) shall not operate more than 500 houMachine-extracted normative operating-hours statement; second review pending.p. 7
GEN-1 through GEN-24500 hours/year) shall not operate more than 29 hours per year for scheduled maintenance checks and readiness testing (Scheduled MCRT, as provided in Condition 3.c). Each individual emergency diesel engine gen-set (Ref. Nos. GEN-1 through GEN-24) shall not operate more than 500 hours per year for all purposes (as provided in Condition 3) combined. The annual limits for hours of operation shall be calculated monthly as the sum of each consecutive 12-month period. Compliance for the consecutive 12-month periodMachine-extracted normative operating-hours statement; second review pending.p. 7

Permitted emission limits

10 pollutant, unit-group and limit rows. These are permit terms, not measured or actual emissions.

Inspect 10 transcribed limit rows
ReferencePollutantLimitBasis / scopeSource
NOx as NO258.51 lb/hrhourlyper unitp. 9Machine-extracted from an official permit limit table; header grouping requires second review.
Units CombinedNOx as NO294.50 tpyannualcombinedp. 9Machine-extracted from an official permit limit table; header grouping requires second review.
NOx as NO26.05 lb/hrhourlyper unitp. 9Machine-extracted from an official permit limit table; header grouping requires second review.
Units CombinedNOx as NO247.31 tpyannualcombinedp. 9Machine-extracted from an official permit limit table; header grouping requires second review.
VOC2.87 lb/hrhourlyper unitp. 9Machine-extracted from an official permit limit table; header grouping requires second review.
Units CombinedVOC22.49 tpyannualcombinedp. 9Machine-extracted from an official permit limit table; header grouping requires second review.
PM101.50 lb/hrhourlyper unitp. 9Machine-extracted from an official permit limit table; header grouping requires second review.
Units CombinedPM104.70 tpyannualcombinedp. 9Machine-extracted from an official permit limit table; header grouping requires second review.
PM2.51.50 lb/hrhourlyper unitp. 9Machine-extracted from an official permit limit table; header grouping requires second review.
Units CombinedPM2.54.70 tpyannualcombinedp. 9Machine-extracted from an official permit limit table; header grouping requires second review.

DOCUMENT HISTORY

What this document says it changes

permit to construct and operate

No superseded-document date is asserted beyond the cited source wording.

p. 1, p. 3

QA NOTES

Ambiguity stays visible

  • Machine-extracted candidate. Verify every reused value against the cited official PDF page.
  • Verify table column grouping and any alternative models.
  • Confirm whether the limit is per unit, combined, or limited to testing/maintenance.
  • Confirm multi-row and merged-column header association.
← Return to evidence index