Page-cited permit extraction

Amazon Data Services, Inc.

Loudoun Co., Virginia

QA status Machine-extractedRelease dated July 29, 2026

EVIDENCE NOTE

What the public record says

A machine-extracted candidate of equipment groups and permit limits stated in Virginia DEQ permit 74181-1, with one-based PDF page citations. Permitted terms do not establish actual operation or emissions.

Primary sourceVirginia DEQ permit document

Virginia Department of Environmental Quality

Open original source ↗

Summary fields cite p. 1.

What this record does not establish

The source confirms the document and its stated fields. This profile does not infer actual emissions, compliance history, operating status, facility capacity or environmental impact where those facts are not established by the cited document.

How to read the status

Issued means the agency granted the permit subject to its conditions. It does not mean every permitted unit is operating, that maximum permitted emissions occur, or that later amendments do not exist.

MACHINE-EXTRACTED CANDIDATE

Equipment and limits,
kept separate from actual use.

These page-cited rows are machine-extracted and still require a second manual review. Verify every reused value against the linked official PDF. Page numbers refer to the one-based position in the linked PDF. Blank values are not zero.

Permitted equipment

2 document-defined equipment groups. Counts and per-unit ratings are transcribed; combined capacity is not calculated.

ReferenceEquipment / modelCount / ratingFuel / controlsStated operating fieldSource
emergency engine generator set4 units2500 kW eachdiesel fuel oilSee operating-scope tablep. 5Machine-extracted from explicit permit prose: Equipment Description Rated Federal Original Permit Date Capacil Requirements Forty-four (44) CaterpillaF 3,633 bhp 1 through 44 3516C-HD emergency 2,500 ekW None March 19, 2020 diesel engine gen-sets (each unit) Transitory Equipment to beC onstructed atI AD-146a ndI AD-147: Standby Reference No
engine generator set1 unitsNo reliable per-unit rating transcribedSee operating-scope tablep. 5Machine-extracted from explicit permit prose: PROCESS REQUIREMENTS 1' Enus"onc on,tro^Emi^ons fromt hee mergencyd iesele ngine-gen-sets shallb e the following: a'

Operating scope

Authorized hours, time windows or an explicit finding that no numeric annual-hour cap was located in the reviewed sections.

ReferenceLimitBasisSource
1 4426 hours/yearirst time the affected units is started on-site and ending when the affecteduiihS integrated with the sources electrical system. (9 VAC 5-80-1180) 7 operatmg Hours - Eachi ndividual emergency diesele ngineg en-set( Ref. Nos. 1 44) shall not operate more than 26 hours per year for scheduled maintenaii ce. Eachi ndividuale mergencyd iesele ngineg en-set( Ref.N os. 1 through4 4, Tl andT 2) shall not operatem ore than 500h oursp ery earf or all purposes (asp rovided in Condition'f Thea nnuall imMachine-extracted normative operating-hours statement; second review pending.p. 8

Permitted emission limits

3 pollutant, unit-group and limit rows. These are permit terms, not measured or actual emissions.

Inspect 3 transcribed limit rows
ReferencePollutantLimitBasis / scopeSource
NOx as NO251 tpyannualper unitp. 10Machine-extracted from a page line in an older official PDF; literal context: All Operations Scheduled Maintenance (44 Units Combined) (44 Units Combined) Nitrogen Oxides (NOx as NOz) 93. 51 tpy 27. 49 tpy CarbonM onoxide (CO)
NOx as NO249 tpyannualcombinedp. 10Machine-extracted from a page line in an older official PDF; literal context: All Operations Scheduled Maintenance (44 Units Combined) (44 Units Combined) Nitrogen Oxides (NOx as NOz) 93. 51 tpy 27. 49 tpy CarbonM onoxide (CO)
visible emissions20 percent opacityvisiblep. 12Machine-extracted from a page line in an older official PDF; literal context: Dunngs tartup ands hutdown, visible emissions from eache mergency diesele ngineg en-set shall not exceed 10%o pacity except during one 6-minute periocfin anyo neh ouri n^ hich" Ylsib!e-emissions sha11n ot exceed 20% opacity as determined by EPA'Method 9 i 40 CFR 60, Appendix A).

DOCUMENT HISTORY

What this document says it changes

No separate amendment-history row is published for this Release 2 record.

QA NOTES

Ambiguity stays visible

  • Machine-extracted candidate. Verify every reused value against the cited official PDF page.
  • Prose fallback; verify equipment grouping.
  • Confirm whether the limit is per unit, combined, or limited to testing/maintenance.
  • Older-PDF text fallback; verify row and unit alignment.
← Return to evidence index