Group 1 (Ref. Nos. EG1 through EG26 and EG193 through EG260) | NOx as NO2— | 53.48 lb/hrhourly | —— | p. 16 ↗Machine-extracted from an official permit limit table; header grouping requires second review. |
Group 1 (Ref. Nos. EG1 through EG26 and EG193 through EG260) | NOx as NO2— | 10.34 lb/hrhourly | —— | p. 16 ↗Machine-extracted from an official permit limit table; header grouping requires second review. |
Group 1 (Ref. Nos. EG1 through EG26 and EG193 through EG260) | VOC— | 1.25 lb/hrhourly | —— | p. 16 ↗Machine-extracted from an official permit limit table; header grouping requires second review. |
Group 1 (Ref. Nos. EG1 through EG26 and EG193 through EG260) | PM10— | 1.01 lb/hrhourly | —— | p. 16 ↗Machine-extracted from an official permit limit table; header grouping requires second review. |
Group 1 (Ref. Nos. EG1 through EG26 and EG193 through EG260) | PM2.5— | 1.01 lb/hrhourly | —— | p. 16 ↗Machine-extracted from an official permit limit table; header grouping requires second review. |
Group 2 (Ref. Nos. EG53 through EG62 and EG261 through EG279) | NOx as NO2— | 34.18 lb/hrhourly | —— | p. 17 ↗Machine-extracted from an official permit limit table; header grouping requires second review. |
Group 2 (Ref. Nos. EG53 through EG62 and EG261 through EG279) | NOx as NO2— | 5.90 lb/hrhourly | —— | p. 17 ↗Machine-extracted from an official permit limit table; header grouping requires second review. |
Group 2 (Ref. Nos. EG53 through EG62 and EG261 through EG279) | VOC— | 0.91 lb/hrhourly | —— | p. 17 ↗Machine-extracted from an official permit limit table; header grouping requires second review. |
Group 2 (Ref. Nos. EG53 through EG62 and EG261 through EG279) | PM10— | 0.55 lb/hrhourly | —— | p. 17 ↗Machine-extracted from an official permit limit table; header grouping requires second review. |
Group 2 (Ref. Nos. EG53 through EG62 and EG261 through EG279) | PM2.5— | 0.55 lb/hrhourly | —— | p. 17 ↗Machine-extracted from an official permit limit table; header grouping requires second review. |
Group 3 (Ref. Nos. EG63 through EG192) | NOx as NO2— | 7.24 lb/hrhourly | —— | p. 17 ↗Machine-extracted from an official permit limit table; header grouping requires second review. |
Group 3 (Ref. Nos. EG63 through EG192) | VOC— | 0.40 lb/hrhourly | —— | p. 17 ↗Machine-extracted from an official permit limit table; header grouping requires second review. |
Group 3 (Ref. Nos. EG63 through EG192) | PM10— | 0.13 lb/hrhourly | —— | p. 17 ↗Machine-extracted from an official permit limit table; header grouping requires second review. |
Group 3 (Ref. Nos. EG63 through EG192) | PM2.5— | 0.13 lb/hrhourly | —— | p. 17 ↗Machine-extracted from an official permit limit table; header grouping requires second review. |
Ref. No. FWP1 | NOx as NO2— | 0.47 lb/hrhourly | —— | p. 18 ↗Machine-extracted from an official permit limit table; header grouping requires second review. |
Ref. No. FWP2 | NOx as NO2— | 1.08 lb/hrhourly | —— | p. 18 ↗Machine-extracted from an official permit limit table; header grouping requires second review. |
Ref. No. FWP1 | NOx as NO2— | 0.11 lb/hrhourly | —— | p. 18 ↗Machine-extracted from an official permit limit table; header grouping requires second review. |
Ref. No. FWP2 | NOx as NO2— | 0.43 lb/hrhourly | —— | p. 18 ↗Machine-extracted from an official permit limit table; header grouping requires second review. |
Ref. No. FWP1 | VOC— | 0.03 lb/hrhourly | —— | p. 18 ↗Machine-extracted from an official permit limit table; header grouping requires second review. |
Ref. No. FWP2 | VOC— | 0.09 lb/hrhourly | —— | p. 18 ↗Machine-extracted from an official permit limit table; header grouping requires second review. |
Ref. No. FWP1 | PM10— | 0.02 lb/hrhourly | —— | p. 18 ↗Machine-extracted from an official permit limit table; header grouping requires second review. |
Ref. No. FWP2 | PM10— | 0.04 lb/hrhourly | —— | p. 18 ↗Machine-extracted from an official permit limit table; header grouping requires second review. |
Ref. No. FWP1 | PM2.5— | 0.02 lb/hrhourly | —— | p. 18 ↗Machine-extracted from an official permit limit table; header grouping requires second review. |
Ref. No. FWP2 | PM2.5— | 0.04 lb/hrhourly | —— | p. 18 ↗Machine-extracted from an official permit limit table; header grouping requires second review. |
Ref. Nos. CT1 through CT22 (all units combined) | PM10— | 3.11 tpyannual | combined— | p. 18 ↗Machine-extracted from an official permit limit table; header grouping requires second review. |
Ref. Nos. CT1 through CT22 (all units combined) | PM2.5— | 1.87 tpyannual | combined— | p. 18 ↗Machine-extracted from an official permit limit table; header grouping requires second review. |
Group 1 through Group 3 (Ref. Nos. EG1 through EG26 and EG53 through EG279 (all units combined) | NOx as NO2— | 95.00 tpyannual | combined— | p. 18 ↗Machine-extracted from an official permit limit table; header grouping requires second review. |
Group 1 through Group 3 (Ref. Nos. EG1 through EG26 and EG53 through EG279 (all units combined) | VOC— | 5.73 tpyannual | combined— | p. 18 ↗Machine-extracted from an official permit limit table; header grouping requires second review. |
Group 1 through Group 3 (Ref. Nos. EG1 through EG26 and EG53 through EG279 (all units combined) | PM10— | 3.80 tpyannual | combined— | p. 18 ↗Machine-extracted from an official permit limit table; header grouping requires second review. |
Group 1 through Group 3 (Ref. Nos. EG1 through EG26 and EG53 through EG279 (all units combined) | PM2.5— | 3.80 tpyannual | combined— | p. 18 ↗Machine-extracted from an official permit limit table; header grouping requires second review. |
| visible emissions— | 5 percent opacityvisible | —— | p. 19 ↗Machine-extracted from a page line in an older official PDF; literal context: (Ref. Nos. EG1 through EG26, EG53 through EG62, and EG193 through EG279), non- emergency diesel engine gen-set (Ref. Nos. EG63 through EG192) and fire pump diesel engine (Ref. Nos. FWP1 and FWP2) shall not exceed 5% opacity except during one 6- minute period in any one hour in which visible emissions shall not exceed 10% opacity as |
| visible emissions— | 10 percent opacityvisible | —— | p. 19 ↗Machine-extracted from a page line in an older official PDF; literal context: emergency diesel engine gen-set (Ref. Nos. EG63 through EG192) and fire pump diesel engine (Ref. Nos. FWP1 and FWP2) shall not exceed 5% opacity except during one 6- minute period in any one hour in which visible emissions shall not exceed 10% opacity as determined by EPA Method 9 (reference 40 CFR 60, Appendix A). This condition applies |
| visible emissions— | 20 percent opacityvisible | —— | p. 19 ↗Machine-extracted from a page line in an older official PDF; literal context: emergency diesel engine gen-set (Ref. Nos. EG63 through EG192) and fire pump diesel engine (Ref. Nos. FWP1 and FWP2) shall not exceed 10% opacity except during one 6- minute period in any one hour in which visible emissions shall not exceed 20% opacity as determined by EPA Method 9 (reference 40 CFR 50, Appendix A). |