Page-cited permit extraction

Valo Park

Fairfax Co., Virginia

QA status Machine-extractedRelease dated July 29, 2026

EVIDENCE NOTE

What the public record says

A machine-extracted candidate of equipment groups and permit limits stated in Virginia DEQ permit 73230-2, with one-based PDF page citations. Permitted terms do not establish actual operation or emissions.

Primary sourceVirginia DEQ permit document

Virginia Department of Environmental Quality

Open original source ↗

Summary fields cite p. 1, p. 3.

What this record does not establish

The source confirms the document and its stated fields. This profile does not infer actual emissions, compliance history, operating status, facility capacity or environmental impact where those facts are not established by the cited document.

How to read the status

Issued means the agency granted the permit subject to its conditions. It does not mean every permitted unit is operating, that maximum permitted emissions occur, or that later amendments do not exist.

MACHINE-EXTRACTED CANDIDATE

Equipment and limits,
kept separate from actual use.

These page-cited rows are machine-extracted and still require a second manual review. Verify every reused value against the linked official PDF. Page numbers refer to the one-based position in the linked PDF. Blank values are not zero.

Permitted equipment

1 document-defined equipment groups. Counts and per-unit ratings are transcribed; combined capacity is not calculated.

ReferenceEquipment / modelCount / ratingFuel / controlsStated operating fieldSource
engine generator set4 unitsNo reliable per-unit rating transcribedSee operating-scope tablep. 1Machine-extracted from explicit permit prose: Christie: Attached is a permit to operate four engine-generator sets located at 7950 Jones Branch Drive in McLean, Virginia

Operating scope

Authorized hours, time windows or an explicit finding that no numeric annual-hour cap was located in the reviewed sections.

ReferenceLimitBasisSource

Permitted emission limits

1 pollutant, unit-group and limit rows. These are permit terms, not measured or actual emissions.

Inspect 1 transcribed limit rows
ReferencePollutantLimitBasis / scopeSource
' each engine-generator set (Ref. No 1-4 )CO2.97 lb/hrhourlyp. 8Machine-extracted from a page line in an older official PDF; literal context: NOx = (Total monthly hours of operation of the engine-generator sets x 40.87 lb/hr) * 2000 CO = (Total monthly hours of operation of the engine-generator sets x 2.97 lb/hr) -2000

DOCUMENT HISTORY

What this document says it changes

No separate amendment-history row is published for this Release 2 record.

QA NOTES

Ambiguity stays visible

  • Machine-extracted candidate. Verify every reused value against the cited official PDF page.
  • Prose fallback; verify equipment grouping.
  • Older-PDF text fallback; verify row and unit alignment.
← Return to evidence index