Page-verified permit transcription

Amazon Data Services Inc IAD-45

Prince William County, Virginia

QA status VerifiedRelease dated July 29, 2026

EVIDENCE NOTE

What the public record says

A manually verified transcription of equipment groups and permit limits stated in Virginia DEQ permit 74333-1, with one-based PDF page citations. Permitted terms do not establish actual operation or emissions.

Primary sourceVirginia DEQ permit document

Virginia Department of Environmental Quality

Open original source ↗

Summary fields cite p. 3, p. 4.

What this record does not establish

The source confirms the document and its stated fields. This profile does not infer actual emissions, compliance history, operating status, facility capacity or environmental impact where those facts are not established by the cited document.

How to read the status

Issued means the agency granted the permit subject to its conditions. It does not mean every permitted unit is operating, that maximum permitted emissions occur, or that later amendments do not exist.

VERIFIED PERMIT TERMS

Equipment and limits,
kept separate from actual use.

This is a conservative transcription of reviewed permit sections, not an exhaustive legal digest. Page numbers refer to the one-based position in the linked PDF. Blank values are not zero.

Permitted equipment

3 document-defined equipment groups. Counts and per-unit ratings are transcribed; combined capacity is not calculated.

ReferenceEquipment / modelCount / ratingFuel / controlsStated operating fieldSource
1 through 22non-emergency engine gen-setCaterpillar · 3516E22 units2750 kW eachdiesel fuel oil unless noted in permitSCR and cDPFSee operating-scope tablep. 5
23emergency engine gen-setCaterpillar · C181 units750 kW eachdiesel fuel oil unless noted in permitnoneSee operating-scope tablep. 5
T1 and T2emergency engine gen-setCaterpillar · 3516C2 units2000 kW eachdiesel fuel oil unless noted in permitnoneSee operating-scope tablep. 5

Operating scope

Authorized hours, time windows or an explicit finding that no numeric annual-hour cap was located in the reviewed sections.

ReferenceLimitBasisSource
23, T1 and T2500 hours/year per unitall emergency purposesCondition 10 continues on PDF page 10.p. 9
23, T1 and T235 hours/year per unitscheduled MCRTCondition 10 continues on PDF page 10.p. 9
1 through 22No numeric value statedno numeric annual hour cap located for non-emergency unitsOperation bounded by fuel-throughput equation and other conditions; no numeric hour cap transcribed.p. 11

Permitted emission limits

32 pollutant, unit-group and limit rows. These are permit terms, not measured or actual emissions.

Inspect 32 transcribed limit rows
ReferencePollutantLimitBasis / scopeSource
23 / Caterpillar C18NOx as NO2emergency14.34 lb/hrhourlyper unitemergency operationp. 12
23 / Caterpillar C18COemergency1.28 lb/hrhourlyper unitemergency operationp. 12
23 / Caterpillar C18VOCemergency0.28 lb/hrhourlyper unitemergency operationp. 12
23 / Caterpillar C18PMemergency0.15 lb/hrhourlyper unitemergency operationp. 12
23 / Caterpillar C18PM10emergency0.15 lb/hrhourlyper unitemergency operationp. 12
23 / Caterpillar C18PM2.5emergency0.15 lb/hrhourlyper unitemergency operationp. 12
23 / Caterpillar C18SO2emergency0.01 lb/hrhourlyper unitemergency operationp. 12
T1,T2 / Caterpillar 3516CNOx as NO2emergency38.85 lb/hrhourlyper unitemergency operationp. 12
T1,T2 / Caterpillar 3516CCOemergency3.92 lb/hrhourlyper unitemergency operationp. 12
T1,T2 / Caterpillar 3516CVOCemergency1.14 lb/hrhourlyper unitemergency operationp. 12
T1,T2 / Caterpillar 3516CPMemergency0.57 lb/hrhourlyper unitemergency operationp. 12
T1,T2 / Caterpillar 3516CPM10emergency0.57 lb/hrhourlyper unitemergency operationp. 12
T1,T2 / Caterpillar 3516CPM2.5emergency0.57 lb/hrhourlyper unitemergency operationp. 12
T1,T2 / Caterpillar 3516CSO2emergency0.03 lb/hrhourlyper unitemergency operationp. 12
1 through 22 / Caterpillar 3516ENOx as NO2SCR controlled4.46 lb/hrhourlyper unitnon-emergency operationp. 13
1 through 22 / Caterpillar 3516ENOx as NO2uncontrolled53.48 lb/hrhourlyper unitnon-emergency operationp. 13
1 through 22 / Caterpillar 3516ECOcDPF controlled2.05 lb/hrhourlyper unitnon-emergency operationp. 13
1 through 22 / Caterpillar 3516EVOCcDPF controlled0.45 lb/hrhourlyper unitnon-emergency operationp. 13
1 through 22 / Caterpillar 3516EPMcDPF controlled0.18 lb/hrhourlyper unitnon-emergency operationp. 13
1 through 22 / Caterpillar 3516EPM10cDPF controlled0.18 lb/hrhourlyper unitnon-emergency operationp. 13
1 through 22 / Caterpillar 3516EPM2.5cDPF controlled0.18 lb/hrhourlyper unitnon-emergency operationp. 13
1 through 22 / Caterpillar 3516ESO2stated limit0.04 lb/hrhourlyper unitnon-emergency operationp. 13
all unitsNOx as NO2all operations96.03 tpyannualall units combinedall purposesp. 13
all unitsCOall operations55.99 tpyannualall units combinedall purposesp. 13
all unitsVOCall operations24.7 tpyannualall units combinedall purposesp. 13
all unitsPMall operations3.95 tpyannualall units combinedall purposesp. 13
all unitsPM10all operations3.95 tpyannualall units combinedall purposesp. 13
all unitsPM2.5all operations3.95 tpyannualall units combinedall purposesp. 13
all unitsSO2all operations0.87 tpyannualall units combinedall purposesp. 13
all unitsvisible emissionsstated opacity limit5 percent opacityvisibleper exhaust/sourcenormal operationp. 14
all unitsvisible emissionsstated opacity limit10 percent opacityvisibleper exhaust/sourceemergency one six-minute exception; also startup/shutdown baselinep. 14
all unitsvisible emissionsstated opacity limit20 percent opacityvisibleper exhaust/sourceone six-minute period in any one hour during startup/shutdownp. 14

DOCUMENT HISTORY

What this document says it changes

new minor NSR permit

No superseded-document date is asserted beyond the cited source wording.

p. 3, p. 4

QA NOTES

Ambiguity stays visible

  • Transcribed from exact official PDF; source page is 1-based PDF position.
← Return to evidence index