Page-verified permit transcription

Cashvad Ventures LLC

Prince William County, Virginia

QA status VerifiedRelease dated July 29, 2026

EVIDENCE NOTE

What the public record says

A manually verified transcription of equipment groups and permit limits stated in Virginia DEQ permit 74118-3, with one-based PDF page citations. Permitted terms do not establish actual operation or emissions.

Primary sourceVirginia DEQ permit document

Virginia Department of Environmental Quality

Open original source ↗

Summary fields cite p. 3, p. 4.

What this record does not establish

The source confirms the document and its stated fields. This profile does not infer actual emissions, compliance history, operating status, facility capacity or environmental impact where those facts are not established by the cited document.

How to read the status

Issued means the agency granted the permit subject to its conditions. It does not mean every permitted unit is operating, that maximum permitted emissions occur, or that later amendments do not exist.

VERIFIED PERMIT TERMS

Equipment and limits,
kept separate from actual use.

This is a conservative transcription of reviewed permit sections, not an exhaustive legal digest. Page numbers refer to the one-based position in the linked PDF. Blank values are not zero.

Permitted equipment

3 document-defined equipment groups. Counts and per-unit ratings are transcribed; combined capacity is not calculated.

ReferenceEquipment / modelCount / ratingFuel / controlsStated operating fieldSource
EG-GR-1 through EG-GR-30non-emergency engine gen-setCaterpillar · C175-2030 units4000 kW eachdiesel fuel oil unless noted in permitSCR and cDPFSee operating-scope tablep. 5
EG-GR-31 through EG-GR-195non-emergency engine gen-setCaterpillar · 3516E165 units3000 kW eachdiesel fuel oil unless noted in permitSCR and cDPFSee operating-scope tablep. 5
CT1 through CT10cooling tower10 unitsNo reliable per-unit rating transcribeddiesel fuel oil unless noted in permitdrift eliminator, 0.001% design lossSee operating-scope tablep. 5Rated capacity 1,715 gpm each; not converted to power.

Operating scope

Authorized hours, time windows or an explicit finding that no numeric annual-hour cap was located in the reviewed sections.

ReferenceLimitBasisSource
EG-GR-1 through EG-GR-195No numeric value statedno numeric annual hour cap locatedOzone-season daytime restrictions and integration AQI condition apply; annual diesel throughput is capped instead of a stated numeric operating-hour limit.p. 8
EG-GR-1 through EG-GR-1957 a.m.-5 p.m. clock timescheduled MCRT/stack testing/training prohibited May 1-Sep 30 absent case-by-case exceptionCondition 7.p. 8

Permitted emission limits

41 pollutant, unit-group and limit rows. These are permit terms, not measured or actual emissions.

Inspect 41 transcribed limit rows
ReferencePollutantLimitBasis / scopeSource
EG-GR-1 through EG-GR-30 / C175-20NOx as NO2controlled6.74 lb/hrhourlyper unitnon-emergency operationp. 10
EG-GR-1 through EG-GR-30 / C175-20COcontrolled2.02 lb/hrhourlyper unitnon-emergency operationp. 10
EG-GR-1 through EG-GR-30 / C175-20VOCcontrolled0.18 lb/hrhourlyper unitnon-emergency operationp. 10
EG-GR-1 through EG-GR-30 / C175-20PMcontrolled0.07 lb/hrhourlyper unitnon-emergency operationp. 10
EG-GR-1 through EG-GR-30 / C175-20PM10controlled0.36 lb/hrhourlyper unitnon-emergency operationp. 10
EG-GR-1 through EG-GR-30 / C175-20PM2.5controlled036 lb/hrhourlyper unitnon-emergency operationp. 10Source prints '036' without a decimal for controlled C175-20 PM2.5.
EG-GR-1 through EG-GR-30 / C175-20NOx as NO2uncontrolled84.77 lb/hrhourlyper unitnon-emergency operationp. 10
EG-GR-1 through EG-GR-30 / C175-20COuncontrolled20.44 lb/hrhourlyper unitnon-emergency operationp. 10
EG-GR-1 through EG-GR-30 / C175-20VOCuncontrolled1.82 lb/hrhourlyper unitnon-emergency operationp. 10
EG-GR-1 through EG-GR-30 / C175-20PMuncontrolled0.75 lb/hrhourlyper unitnon-emergency operationp. 10
EG-GR-1 through EG-GR-30 / C175-20PM10uncontrolled1.03 lb/hrhourlyper unitnon-emergency operationp. 10
EG-GR-1 through EG-GR-30 / C175-20PM2.5uncontrolled1.03 lb/hrhourlyper unitnon-emergency operationp. 10
EG-GR-31 through EG-GR-195 / 3516ENOx as NO2controlled4.74 lb/hrhourlyper unitnon-emergency operationp. 10
EG-GR-31 through EG-GR-195 / 3516ECOcontrolled0.97 lb/hrhourlyper unitnon-emergency operationp. 10
EG-GR-31 through EG-GR-195 / 3516EVOCcontrolled0.06 lb/hrhourlyper unitnon-emergency operationp. 10
EG-GR-31 through EG-GR-195 / 3516EPMcontrolled0.18 lb/hrhourlyper unitnon-emergency operationp. 10
EG-GR-31 through EG-GR-195 / 3516EPM10controlled0.4 lb/hrhourlyper unitnon-emergency operationp. 10
EG-GR-31 through EG-GR-195 / 3516EPM2.5controlled0.4 lb/hrhourlyper unitnon-emergency operationp. 10
EG-GR-31 through EG-GR-195 / 3516ENOx as NO2uncontrolled59.56 lb/hrhourlyper unitnon-emergency operationp. 10
EG-GR-31 through EG-GR-195 / 3516ECOuncontrolled9.81 lb/hrhourlyper unitnon-emergency operationp. 10
EG-GR-31 through EG-GR-195 / 3516EVOCuncontrolled0.58 lb/hrhourlyper unitnon-emergency operationp. 10
EG-GR-31 through EG-GR-195 / 3516EPMuncontrolled1.78 lb/hrhourlyper unitnon-emergency operationp. 10
EG-GR-31 through EG-GR-195 / 3516EPM10uncontrolled2.0 lb/hrhourlyper unitnon-emergency operationp. 10
EG-GR-31 through EG-GR-195 / 3516EPM2.5uncontrolled2.0 lb/hrhourlyper unitnon-emergency operationp. 10
EG-GR-1 through EG-GR-195NOx as NO2uncontrolled operations51.04 tpyannualall units combineduncontrolled operationsp. 11
EG-GR-1 through EG-GR-195COuncontrolled operations18.67 tpyannualall units combineduncontrolled operationsp. 11
EG-GR-1 through EG-GR-195VOCuncontrolled operations2.81 tpyannualall units combineduncontrolled operationsp. 11
EG-GR-1 through EG-GR-195PMuncontrolled operations1.24 tpyannualall units combineduncontrolled operationsp. 11
EG-GR-1 through EG-GR-195PM10uncontrolled operations1.4 tpyannualall units combineduncontrolled operationsp. 11
EG-GR-1 through EG-GR-195PM2.5uncontrolled operations1.4 tpyannualall units combineduncontrolled operationsp. 11
EG-GR-1 through EG-GR-195NOx as NO2all operations98.9 tpyannualall units combinedall operationsp. 11
EG-GR-1 through EG-GR-195COall operations40.43 tpyannualall units combinedall operationsp. 11
EG-GR-1 through EG-GR-195VOCall operations6.12 tpyannualall units combinedall operationsp. 11
EG-GR-1 through EG-GR-195PMall operations2.71 tpyannualall units combinedall operationsp. 11
EG-GR-1 through EG-GR-195PM10all operations4.69 tpyannualall units combinedall operationsp. 11
EG-GR-1 through EG-GR-195PM2.5all operations4.69 tpyannualall units combinedall operationsp. 11
CT1 through CT10PMcontrolled by drift eliminators0.94 tpyannualall units combinedcooling tower operationp. 11
CT1 through CT10PM10controlled by drift eliminators0.52 tpyannualall units combinedcooling tower operationp. 11
EG-GR-1 through EG-GR-195visible emissionsstated opacity limit5 percent opacityvisibleper exhaust/sourcenormal operationp. 11
EG-GR-1 through EG-GR-195visible emissionsstated opacity limit10 percent opacityvisibleper exhaust/sourcestartup/shutdownp. 11
EG-GR-1 through EG-GR-195visible emissionsstated opacity limit20 percent opacityvisibleper exhaust/sourceone six-minute period in any one hour during startup/shutdownp. 11

DOCUMENT HISTORY

What this document says it changes

new minor NSR permit

No superseded-document date is asserted beyond the cited source wording.

p. 3, p. 4

QA NOTES

Ambiguity stays visible

  • Transcribed from exact official PDF; source page is 1-based PDF position.
← Return to evidence index