What the public record says

A machine-extracted candidate of equipment groups and permit limits stated in Virginia DEQ permit 74237-1, with one-based PDF page citations. Permitted terms do not establish actual operation or emissions.

Primary sourceVirginia DEQ permit document

Virginia Department of Environmental Quality

Open original source ↗

Summary fields cite p. 1, p. 3.

What this record does not establish

The source confirms the document and its stated fields. This profile does not infer actual emissions, compliance history, operating status, facility capacity or environmental impact where those facts are not established by the cited document.

How to read the status

Issued means the agency granted the permit subject to its conditions. It does not mean every permitted unit is operating, that maximum permitted emissions occur, or that later amendments do not exist.

MACHINE-EXTRACTED CANDIDATE

Equipment and limits,
kept separate from actual use.

These page-cited rows are machine-extracted and still require a second manual review. Verify every reused value against the linked official PDF. Page numbers refer to the one-based position in the linked PDF. Blank values are not zero.

Permitted equipment

3 document-defined equipment groups. Counts and per-unit ratings are transcribed; combined capacity is not calculated.

ReferenceEquipment / modelCount / ratingFuel / controlsStated operating fieldSource
EG-01emergency engine generator setCaterpillar · C27 units750 kW eachdiesel fuel oilSee operating-scope tablep. 4Machine-extracted from an official document equipment table; column grouping requires second review.
EG-02 – EG-21emergency engine generator setCaterpillar · C175-1620 units3100 kW eachdiesel fuel oilSee operating-scope tablep. 4Machine-extracted from an official document equipment table; column grouping requires second review.
FWP-01 and FWP-02fire-pump engineJohn Deere · 4045 Series2 units110 bhp eachdiesel fuel oilSee operating-scope tablep. 4Machine-extracted from an official document equipment table; column grouping requires second review.

Operating scope

Authorized hours, time windows or an explicit finding that no numeric annual-hour cap was located in the reviewed sections.

ReferenceLimitBasisSource
EG-01 through EG-2121 hours/yearunit is started on-site and ending when the affected unit is fully integrated with the sources electrical system. (9VAC5-80-1180) 7. Operating Hours – Each individual emergency diesel engine gen-set (Ref. Nos. EG-01 through EG-21) shall not operate more than 21 hours per year for scheduled maintenance checks and readiness testing (Scheduled MCRT, as provided in Condition 6.c). Each individual emergency diesel engine gen-set (Ref. Nos. EG-01 through EG-21) shall not operate more than 500 hourMachine-extracted normative operating-hours statement; second review pending.p. 7
EG-01 through EG-21500 hours/year1) shall not operate more than 21 hours per year for scheduled maintenance checks and readiness testing (Scheduled MCRT, as provided in Condition 6.c). Each individual emergency diesel engine gen-set (Ref. Nos. EG-01 through EG-21) shall not operate more than 500 hours per year for all purposes (as provided in Condition 6) combined. The annual limits for hours of operation shall be calculated monthly as the sum of each consecutive 12-month period. Compliance for the consecutive 12-month periodMachine-extracted normative operating-hours statement; second review pending.p. 7

Permitted emission limits

23 pollutant, unit-group and limit rows. These are permit terms, not measured or actual emissions.

Inspect 23 transcribed limit rows
ReferencePollutantLimitBasis / scopeSource
Ref. No. EG-01NOx as NO214.74 lb/hrhourlyp. 9Machine-extracted from an official permit limit table; header grouping requires second review.
Ref. Nos. EG-02 through EG-21NOx as NO257.89 lb/hrhourlyp. 9Machine-extracted from an official permit limit table; header grouping requires second review.
Ref. Nos. EG-02 through EG-21NOx as NO20.93 lb/hrhourlyp. 9Machine-extracted from an official permit limit table; header grouping requires second review.
Ref. No. EG-01NOx as NO21.55 lb/hrhourlyp. 9Machine-extracted from an official permit limit table; header grouping requires second review.
Ref. Nos. EG-02 through EG-21NOx as NO27.46 lb/hrhourlyp. 9Machine-extracted from an official permit limit table; header grouping requires second review.
Ref. Nos. EG-02 through EG-21NOx as NO20.57 lb/hrhourlyp. 9Machine-extracted from an official permit limit table; header grouping requires second review.
Ref. No. EG-01VOC0.24 lb/hrhourlyp. 9Machine-extracted from an official permit limit table; header grouping requires second review.
Ref. Nos. EG-02 through EG-21VOC0.85 lb/hrhourlyp. 9Machine-extracted from an official permit limit table; header grouping requires second review.
Ref. Nos. EG-02 through EG-21VOC0.06 lb/hrhourlyp. 9Machine-extracted from an official permit limit table; header grouping requires second review.
Ref. No. EG-01PM100.36 lb/hrhourlyp. 9Machine-extracted from an official permit limit table; header grouping requires second review.
Ref. Nos. EG-02 through EG-21PM100.39 lb/hrhourlyp. 9Machine-extracted from an official permit limit table; header grouping requires second review.
Ref. Nos. EG-02 through EG-21PM100.06 lb/hrhourlyp. 9Machine-extracted from an official permit limit table; header grouping requires second review.
Ref. No. EG-01PM2.50.36 lb/hrhourlyp. 9Machine-extracted from an official permit limit table; header grouping requires second review.
Ref. Nos. EG-02 through EG-21PM2.50.39 lb/hrhourlyp. 9Machine-extracted from an official permit limit table; header grouping requires second review.
Ref. Nos. EG-02 through EG-21PM2.50.06 lb/hrhourlyp. 9Machine-extracted from an official permit limit table; header grouping requires second review.
Ref. Nos. EG-01 through EG-21 and FWP-01NOx as NO290.09 tpyannualp. 9Machine-extracted from an official permit limit table; header grouping requires second review.
Ref. Nos. EG-01 through EG-21 and FWP-01NOx as NO234.46 tpyannualp. 9Machine-extracted from an official permit limit table; header grouping requires second review.
Ref. Nos. EG-01 through EG-21 and FWP-01VOC6.21 tpyannualp. 9Machine-extracted from an official permit limit table; header grouping requires second review.
Ref. Nos. EG-01 through EG-21 and FWP-01PM102.49 tpyannualp. 9Machine-extracted from an official permit limit table; header grouping requires second review.
Ref. Nos. EG-01 through EG-21 and FWP-01PM2.52.49 tpyannualp. 9Machine-extracted from an official permit limit table; header grouping requires second review.
visible emissions5 percent opacityvisiblep. 10Machine-extracted from a page line in an older official PDF; literal context: 13. Visible Emission Limit – Visible emissions from each emergency diesel engine gen-set (Ref. Nos. EG-01 through EG-21) and fire pump (Ref. Nos. FWP-01 and FWP-02) exhausts shall not exceed 5% opacity except during one 6-minute period in any one hour in which visible emissions shall not exceed 10% opacity as determined by EPA Method 9
visible emissions10 percent opacityvisiblep. 10Machine-extracted from a page line in an older official PDF; literal context: (Ref. Nos. EG-01 through EG-21) and fire pump (Ref. Nos. FWP-01 and FWP-02) exhausts shall not exceed 5% opacity except during one 6-minute period in any one hour in which visible emissions shall not exceed 10% opacity as determined by EPA Method 9 (reference 40 CFR 60, Appendix A). This condition applies at all times except during
visible emissions20 percent opacityvisiblep. 10Machine-extracted from a page line in an older official PDF; literal context: During startup and shutdown, visible emissions from each emergency diesel engine gen-set and fire pump shall not exceed 10% opacity except during one 6-minute period in any one hour in which visible emissions shall not exceed 20% opacity as determined by EPA Method 9 (reference 40 CFR 60, Appendix A).

DOCUMENT HISTORY

What this document says it changes

permit to construct and operate

No superseded-document date is asserted beyond the cited source wording.

p. 1, p. 3

QA NOTES

Ambiguity stays visible

  • Machine-extracted candidate. Verify every reused value against the cited official PDF page.
  • Verify table column grouping and any alternative models.
  • Confirm whether the limit is per unit, combined, or limited to testing/maintenance.
  • Confirm multi-row and merged-column header association.
  • Older-PDF text fallback; verify row and unit alignment.